This item ships directly from BNR
*Must send turbocharger core before build up! Build time usually is 4-6 weeks*
This is what you get with a BNR MSM Turbocharger upgrade!
- TD05 Lightweight, High-flow Turbine wheel
- BNR Genveration 2 16G Point Milled Compressor wheel
- (44 lb/min) High-performance 360 degree thrust assembly
- BNR’s custom Mitsubishi TD05 bearing housing
- New CHRA (center housing rotating assembly)
- BNR upgraded compressor housing (2.25″ inlet/ 2″ outlet)
- Factory Turbine housing machined to accept TD05 CHRA Upgraded wastegate valve
- Ported wastegate
- Upgraded actuator assembly (set from 11-15 psi crack pressure)
- Easy Adjustable wastegate linkage
- (4) 12mm copper sealing rings (for OE water lines)
- (2) 10mm copper sealing rings (for OE oil supply)
- Oil return gasket
- 1 year warranty